Eighteenth
SpaceWire Working Group meeting
23rd
(PM), 24th (all day) and 25th (AM) of April 2012
The eighteenth SpaceWire Working Group
meeting was held on Monday the 23rd (PM), Tuesday the 24th and Wednesday the
25th (AM) of April 2012 at ESTEC, followed by a SpW WG Steering Committee
meeting on Wednesday the 25th (PM).
The meeting covered specifically the following topics:
SpW Networks for C&C (SpW-D) (Conveners Ph. Armbruster, ESA/ESTEC & S. Parkes, UoDundee)
SpW Evolutions (Convener D. Jameux, ESA/ESTEC), including ECSS-ST-50-12C
Rev.1 and SpW 2
SpW Backplanes (Conveners A. Senior, SEA & M. Nomachi, UoOsaka)
SpW System and Mission Requirements (Convener D. Jameux, ESA/ESTEC)
SpW Test, Verification and “Certification” (Convener Y. Sheynin, UoStPetersburg)
SpW Network Management (Conveners G.
Rakow, NASA/GSFC, P. Mendham, Bright Ascension)
SpW Deployment and Handbook (Convener B. Cook, 4Links)
SpW International SpaceWire Conferences and Working Group meetings (Convener M. Suess, ESA/ESTEC)
Proceedings (C)
Day 1: Monday 23rd April (PM)
Welcome
and Introduction (Philippe Armbruster, ESA/ESTEC)
Session 1: SpW Evolutions part I – SpW2 and SpaceFibre (Conveners D. Jameux and M. Suess, ESA/ESTEC)
This session was dedicated to medium term
disruptive evolutions of the SpaceWire technology such as SpaceFibre and next
generation space interconnect standards.
◦
SpaceFibre Applications and Requirements,
Steve Parkes (UoD) and Paul Rastetter (Astrium)
◦
SpaceFibre Standard, Steve Parkes (UoD)
◦
SpaceFibre Complexity, Steve Parkes (UoD)
◦
SpaceFibre Implementation, Steve Parkes
(UoD)
◦
SpaceFibre Demonstration, Chris McClements
(UoD), Albert Ferrer & Alberto Gonzalez (STAR-Dundee)
◦
SpaceFibre Next Steps, Steve Parkes (UoD)
◦
SpaceWire-RT, Steve Parkes (UoD)
•
Status
of SpaceFibre link module development, Taisto Tuominen, Patria Aviation Oy
Systems
•
Feedback of the SpW community on the
SpaceFibre specification
◦
EOP
needs for SpaceFibre, Josep Rosello, ESA/ESTEC
◦
SpaceFiber
Draft D feedbacks, J.Lachaize, Astrium FR
•
GigaSpaceWire
- Gigabit links for SpaceWire networks,
Yuriy Sheynin, UoStPetersburg
•
Non blocking multi router system, M.
Nomachi, UoOsaka
Support documents:
SpaceFibre
ECSS Draft D v.1.14
Day 2: Tuesday 24th April (all day)
Session 2: SpW Evolutions – part II: ECSS-ST-E-50-12C Rev.1 (Convener D. Jameux, ESA/ESTEC)
This session was dedicated to the revision
of the current SpaceWire standard in preparation for the work of the ECSS
Working Group.
•
ECSS-ST-50-12C
Rev.1 scope and ECSS standardisation agenda,
D.Jameux, ESA/ESTEC
•
Early results of the SpaceWire Evolutions
TRP activity:
◦
Improvements
to the Distributed Interrupts scheme, Antonis Tavoularis, Teletel
◦
Trade-off
around SpW Half-Duplex, Antonis Tavoularis, Teletel
Support documents:
SpW Evolutions - Distributed Interrupts and TELETEL_AT_DistributedInterruptsImprovements
SpW Evolutions - Simplex & Half-Duplex SpW and TELETEL_AT_HalfDuplex_TradeOffs
Session 3: SpW Test, Verification and Certification (Convener Y. Sheynin, UoStPetersburg)
This session was dedicated to the test,
verification and simulation tools and requirements.
•
MOST
SpW traffic simulator – Applications and Improvements, Felix Siegle, UoJena
Session 4: SpW Backplanes
(Conveners A. Senior, SEA & M. Nomachi, UoOsaka)
This session was dedicated to SpaceWire
backplane application requirements, technology survey, SpW backplanes for
ground systems, and other SpW backplane related issues.
•
Introduction, Jørgen Ilstad, ESA/ESTEC
Session 5: System and mission requirements (Convener D. Jameux, ESA/ESTEC)
This session was dedicated to the provision
of SpaceWire-related Data Handling system requirements from System Integrators
and ESA mission teams.
•
System
Requirements & use of Interrupts on SpaceWire link, Brice Dellandrea, TAS
Session 6: SpaceWire Network Management and Protocol Stacks (Conveners G. Rakow, NASA/GSFC, P. Mendham, Bright Ascension)
This session was dedicated to SpaceWire
network management features and protocols such as network discovery and
configuration, Electronic Data Sheets, FDIR, and SpaceWire related protocol stacks.
•
Introduction:
Current SpaceWire protocol stacks, Peter
Mendham, Bright Ascension
Support documents:
SpaceWire
Plug-and-Play Protocol Requirements
Session 7: SpW for C&C (Conveners
Ph. Armbruster, ESA/ESTEC and S. Parkes, UoDundee)
This session was dedicated to SpW-D,
support to PUS time distribution, and other Command & Control issues for
SpaceWire.
•
Time
synchronisation protocol, S. Habinc, Aeroflex Gaisler
•
SpaceWire-D,
Steve Parkes, UoDundee
Day 3: Wednesday 25th April (AM)
Session 8: SpW component developments (Convener
Jørgen Ilstad, ESA/ESTEC)
This session was dedicated to SpaceWire
component development activities.
•
ECI initiative to develop and qualify
European LVDS components:
◦
European
LVDS driver development and ECSS evaluation and qualification, Jørgen Ilstad,
ESA/ESTEC
◦
European
LVDS Driver Development and ESCC Evaluation and Qualification, S. Habinc,
Aeroflex Gaisler
◦
Proposal
for the development of the ESA LVDS transceiver, Francisco Gutiérrez, Arquimea
•
Update
on the “SpaceWire Router ASIC development” GSTP activity, Marko
Isomaki, Aeroflex Gaisler
•
Update
on RTC development equipment and software development
environment, David Paterson, UoDundee
•
AT7913E
SpaceWire RTC, Bernard Bancelin, ATMEL
SpW
Deployment and Handbook, Roger Peel, 4Links
Session 9: Next SpW events (Conveners
Ph. Armbruster and M. Suess, ESA/ESTEC)
This session was dedicated to the
announcement of SpaceWire-related events.
•
Next
SpW conference, Sandi Habinc, Aeroflex Gaisler
•
Next
WG meeting, M. Suess, ESA/ESTEC
Meeting close-out (M. Suess, ESA/ESTEC)
Day 3: Wednesday 25th April (PM)
SpW WG Steering Committee Meeting
List of attendance # 18
SpaceWire Working Group Meeting
Contact Person: Bertilla Sinka Tel : +31
71 565 8559 Email : spacewire.secretary@esa.int
=========================================================================
ESA - ESTEC - Electrical Engineering
Department - Data Systems Division – D. Jameux –01/05/2012