Seventeenth SpaceWire Working Group meeting
13th (PM), 14th (all day) and 15th (AM) of December 2011
The seventeenth SpaceWire Working Group meeting was held on Tuesday the 13th (PM), Wednesday the 14th and Thursday the 15th (AM) of December 2011 at ESTEC, followed by a SpW WG Steering Committee meeting on Thursday the 15th (PM).
The meeting covered specifically the following topics:
SpW networks for C&C
(SpW-D) (Conveners Ph. Armbruster, ESA/ESTEC & S. Parkes, UoD)
SpW
Evolutions (Conveners D. Jameux, ESA/ESTEC & M. Suess, ESA/ESTEC)
SpW
Backplanes (Conveners A. Senior, SEA & M. Nomachi, UoO)
SpW
Plug-and-Play (Conveners G. Rakow, NASA/GSFC,
C. Taylor, ESA/ESTEC, P.Mendham, SciSys)
SpW Deployment and Handbook (Convener, B. Cook, 4Links)
SpW Test, Verification and Certification (Convener Y. Sheynin, UoStPg)
SpW International SpaceWire Conferences and Working Group meetings
Proceedings (A)
Day 1: Tuesday 13th December (PM)
Welcome and Introduction (Philippe Armbruster, ESA/ESTEC)
Overview
on the Space Avionics Open Interface Architecture (SAVOIR) and role of
SpaceWire in this context (Philippe Armbruster, ESA/ESTEC)
Session 1: SpW for C&C (Conveners Ph. Armbruster, ESA/ESTEC and S. Parkes, UoD)
This session was dedicated to SpW-D, support to PUS time distribution, and other Command & Control issues for SpaceWire.
Comments
on SpaceWire-D, Prof. Takahiro Yamada, JAXA/ISAS
High
Accuracy Time Synchronization over SpaceWire Networks, Sandi Habinc, Aeroflex
Gaisler AB
Proposal for SpaceWire-R, Prof. Takahiro Yamada, JAXA/ISAS
Support documents:
ISC
2011 CCSDS Time Distribution over SpaceWire
Session
2: SpW Evolutions (Convener D. Jameux, ESA/ESTEC) part I
This session was dedicated to the revision of the current SpaceWire standard and other SpaceWire Evolutions issues such as low-mass SpW cable, SpaceFibre, and SpW-RT.
Day 2: Wednesday 14th December (all day)
Session 3: SpW Test, Verification and Certification (Convener Y. Sheynin, UoStPg)
This session was dedicated to the MOST tool (Final Presentation of the SpaceWire Network Bandwidth Performance Simulation Tool TRP activity), update on the Protocol Validation System developed for ESA, and other SpW Test, Verification and Certification issues.
SpW
traffic simulator - Final Presentation, Brice Dellandrea & Philippe
Fourtier, TAS-F (Cannes)
SpW traffic simulator Demo, Loic Parent, TAS-F (
SpW
HW/Simulation cross validation (incl. demo), B.Cook, 4Links
PVS-I and PVS-II, A.Tavoularis, Teletel & K.Marinis, ESA/ESTEC
Support documents:
MOST - Draft Executive Summary & Final Report
Session 4: System requirements (Convener D. Jameux, ESA/ESTEC)
This session was dedicated to the provision of SpaceWire-related Data Handling system requirements from System Integrators.
SpW
developments for on-board data systems, Olivier Notebaert, Astrium
Status
and needs/concerns vs SpW implementation in TAS space missions, Alain Girard,
TAS
Session
2: SpW Evolutions (Convener D. Jameux, ESA/ESTEC) part II
This session was dedicated to the revision of the current SpaceWire standard and other SpaceWire Evolutions issues such as low-mass SpW cable, SpaceFibre, and SpW-RT.
SpW
ECSS standard revision, D.Jameux, ESA/ESTEC,
10 min
Early
results of the PnP stream of the SpaceWire Evolutions ESA activity, P.Mendham, Bright
Ascension
SpW Deployment and Handbook, B. Cook, 4Links
FP7/SPWRT
- Integrated EU and Russian requirements, SpaceWire-RT team (SubMicron &
Astrium GmbH)
FP7/SPWRT - Aims and Baseline Concepts, SpaceWire-RT team (UoD & SUAI)
Support documents:
SpaceWire
handbook (DRAFT - SVN version 23 - December 7, 2011)
Session 5: SpaceWire PnP (Conveners
G. Rakow, NASA/GSFC, C. Taylor, ESA/ESTEC, P. Mendham, Bright Ascension)
This session was dedicated to results from PnP-related ESA R&D activities, update from the SOIS-APP group on Plug-and-Play, Electronic Data Sheets, and other SpaceWire PnP related issues.
Early results of the Network Discovery Protocols ESA activity, Peter Mendham, SciSys/Bright Ascension
Update
on SOIS PnP, Stuart Fowell, SciSys
Session
2: SpW Evolutions (Convener D. Jameux, ESA/ESTEC) part III
Day 3: Thursday 15th December (AM)
Session 6: SpW Backplanes (Conveners A. Senior, SEA & M. Nomachi, UoO)
This session aws dedicated to SpaceWire backplane application requirements, technology survey, SpW backplanes for ground systems, and other SpW backplane related issues.
ESA
SpW Backplane activity, Jψrgen Ilstad, ESA/ESTEC
SpW
BP for Ground system, Masaharu Nomachi, UoOsaka
SpaceWire
Backplane - Application Requirements, Alan Senior, SEA
SpaceWire
Backplane - Technology Survey, Sanjay Sharma, SEA
10:35 Session 7: Other topics
This session will be dedicated to any other SpaceWire related topics.
Common Instrument Interface (CII), Benjamin Bornstein, JPL
SpaceWire
Link Isolation, Gil Baterina, Silanna Semiconductor
Real
Time OS for SpaceWire, Masaharu Nomachi, UoOsaka
Support documents:
An
Overview of NASA's Common Instrument Interface (CII)
12:00 Meeting close-out
Feedback
on SpaceWire2011, Martin Sόss, ESA/ESTEC
Meeting close-out, Philippe Armbruster, ESA/ESTEC
Day 3: Thursday 15th December (PM)
SpW WG Steering Committee Meeting
Support Documents
ISC
2011 CCSDS Time Distribution over SpaceWire
MOST -
Draft Executive Summary & Final Report
An
Overview of NASA's Common Instrument Interface (CII)
Contact Person: Bertilla Sinka Tel : +31 71 565 8559 Email : spacewire.secretary@esa.int
=========================================================================
ESA - ESTEC - Electrical Engineering Department - Data Systems Division B.Sinka 03/01/2012