Sixteenth SpaceWire Working
Group meeting
21st PM, 22nd (all day) and
23rd (AM) of March 2011
The sixteenth SpaceWire Working
Group meeting was held on Monday the 21st (PM), Tuesday the 22nd and Wednesday
the 23rd (AM) of March 2011 at ESTEC, followed by a SpW WG Steering Committee
meeting on Wednesday the 23rd (PM).
The meeting covered specifically the following topics:
·
SpW networks used for C&C and High Throughput Data Transfers
(SpW-D) (Convenors Ph.Armbruster, ESA/ESTEC & S. Parkes, UoD)
·
SpW Evolutions and Standard Revision (Convenors D. Jameux,
ESA/ESTEC & M. Süß, ESA/ESTEC)
·
SpaceWire backplanes (Convenors A. Senior, SEA & M. Nomachi,
UoO)
·
SpaceWire – PnP (Convenors G.Rakow, NASA/GSFC & P.Mendham,
SciSys)
In addition, the other regular topics were addressed:
Proceedings (B+)
Day 1:
Monday 21 March 2011 (pm)
Welcome and
Introduction (Philippe Armbruster, ESA/ESTEC)
Session 1:
SpW -D (Convenor Ph. Armbruster,
ESA/ESTEC & S. Parkes, UoD)
SpW-D
Overview and Trade-offs (Ph.Armbruster, ESA/ESTEC)
Time
Synchronisation in SpW Networks (M.Isomaki, Aeroflex Gaisler)
SpW D Protocol
Trade-Off Criteria (S.Parkes,
UoD)
SpW-D Baseline
Considerations and Proposals (A.Tavoularis, Teletel)
Day 2:
Tuesday 22 March 2011 (all day)
Session 2: SpW Evolutions and Standard revision
(Convenors D.Jameux, ESA/ESTEC & M. Süß, ESA/ESTEC)
Introduction
to SpW Evolutions and Standard revision (M. Süß, ESA/ESTEC)
SpaceWire
standard revision (D.Jameux, ESA/ESTEC)
Proposal for Defining
Standard Services over SpaceWire (T.Yamada, JAXA)
Session 3: SpaceWire related R&D activities (Convenor
D.Jameux, ESA/ESTEC)
SpaceFibre
Very High Speed Link Technology Demonstrator (M. Süß, ESA/ESTEC)
Proposals
on SpW Evolution (A. Khakhulin, Energia)
Low
Mass SpaceWire (J. Ilstad, ESA/ESTEC)
Day 3: Wednesday 23 March 2011 (am)
Session 4: SpaceWire backplanes (Convenors A. Senior, SEA
& M. Nomachi, UoO)
Introduction
to SpaceWire backplanes (A. Senior, SEA Ltd)
SpaceWire
backplane development in Japan (M.Nomachi, UoO)
SpaceWire
backplanes ITT (J. Ilstad, ESA/ESTEC)
SpaceWire
backplanes (A. Senior, SEA Ltd)
SpaceWire
Active Backplane from the software user perspective (P.Mendham, SciSys)
Session 5: SpaceWire PnP (Covenors G.Rakow, NASA/GSFC &
P.Mendham, SciSys)
Introduction by the Convenors to SpW PnP
Presentation
and comparison of different approaches to SpW PnP (P. Mendham, SciSys)
Presentations on Space PnP Architecture
and SpW PnP Protocol (NASA) – please see the Support Documents section below
Session 6: Other topics
SpaceWire Hand Book
(Convenor B. Cook, 4Links)
SpaceWire
International Conferences: SpaceWire2011 (San Antonio TX, USA)
Day 3: Wednesday 23 March (pm)
SpW WG Steering Committee Meeting
Next
meeting will be held in ESA/ESTEC on the following days: 6-8 September 2011.
Support
Documents:
Minutes of SpW WG meeting 15 Session 3
ESA-PhA-SpW-D Requirements and baseline V0-7
UoD-SP-SpW-D Protocol Trade-Off Criteria
TELETEL SpaceWire-D Baseline Considerations and_Proposals
v1
ECSS Change Request/Document Improvement Proposal
SpaceWire
SAPs proposal from SUAI
Space Plug and Play Architecture and SpaceWire from NASA
SpaceWire PnP Protocol from
NASA
Minutes:
Minutes
of SpW WG meeting 16 Session 32
Attendance list:
Contact
Person: Maria Brestanska Tel : +31
71 565 8559 Email : spacewire.secretary@esa.int
=========================================================================
ESA - ESTEC - Electrical Engineering Department - Data Systems Division – M.Brestanska – 26/04/2011 PM