Tenth SpaceWire Working Group meeting,
ESA/ESTEC
20th and 21st of
February 2008
Room Einstein
Scope
The meeting focused on two main topics:
·
The first one dealt with real time
aspects and related services and protocols for SpaceWire networks, enabling Command
and Control applications using SpW. On the basis of quality of service
requirements and definition, constraints applicable to SpW networks when
implementing applications requiring real time behaviour have been discussed.
This includes the mapping of CCSDS services implying such requirements.
(Convenors: Ph. Armbruster, ESA/ESTEC and S. Parkes, UoD)
·
The second main focus was SpaceFibre
(Convenor: M. Suess, ESA/ESTEC)
Other topics:
·
SpW Test, Verification and
“Certification” (Convenor Y. Sheynin, UoStPg)
·
SpW Backplanes (Convenor M.Nomachi, UoO)
·
SpW and Plug and Play (Convenor G.Rakow, NASA/GSFC)
·
SpW Deployment and Handbook (Convenor, B.
Cook, 4Links)
·
SpaceWire International Conference 2008 –
Osaka/Nara 4-5-6 of November 2008 - (M. Nomachi)
Proceedings
Day 1: Wednesday, 20th
of February
Welcome and Introduction,
Ph. Armbruster, ESA
Session 1: SpaceWire Real
Time
·
Introductory Presentations
·
On-board SpW Networks and
Real-time aspects, W. Gasti, ESA
·
SpW for
Cmd&Ctrl, D. Jameux, ESA
·
Time-Triggered
Techniques for Quality of Service over SpaceWire, W. Steiner, TTTech
Computertechnik AG
·
SpaceWire-RT Requirements,
S. Parkes, UoD
·
Use Case Study for
SpaceWire-RT, T. Yamada, JAXA/ISAS
Technical note: SpaceWire-RT
Requirements
Session 2.a: SpaceWire developments status
·
SMCS116SpW,
J. Ilstad, ESA/Estec
·
SpaceWire Router:
SpW_10X, P. Fabry, ESA/Estec
·
Remote
Terminal Controller: SpW-RTC device, J. Ilstad, ESA/Estec
·
SpW-RTC
Development Suite, S. Habinc, Gaisler Research
·
Recent
ASIC developments by NEC, Hiroki
Hihara, NEC
·
Remote Memory
Access Protocol : RMAP, ECSS-E50-11 Standard, M. Suess, ESA/Estec
·
PID
Application: PID for CCSDS Packet Transfer, Ph. Armbruster, ESA/Estec
Session 2.b: SpaceWire SpW Test, Verification and “Certification”
·
SpaceWire Test,
Verification and Certification Requirements and Approaches. Y. Sheynin,
·
SpaceWire – Test, Validation
and Certification: Experiences, Thoughts, and Ideas for Discussion. B.Cook & Paul Walker,
4Links Limited
·
An innovative
method for SpaceWire Test and Verification. G. Magistrati, Carlo Gavazzi Space S.p.A.
·
SpaceWire
Conformance Tester and Validation Software, Star
Day 2: Thursday, 21st
of February
Session 3: SpaceFibre
·
MLAS mission use
of SpaceFibre, G. Rakow, NASA
·
SpaceFibre optical
physical layer, J.Toivonen, PATRIA
·
Details of the SpaceFibre CODEC,
S. Parkes, UoD
·
Comments on
the SpaceFibre outline specification , G. Rakow, NASA
·
Collation
of SpaceFibre Requirements, P. Walker, 4Links
Technical note: SpaceFibre Outline
Specification
Session 4: Other topics,
Part II
·
SpW and Plug and Play (Convenor G.Rakow, NASA/GSFC)
·
Introduction,
G. Rakow, NASA/GSFC
·
Adapting SpaceWire PnP to RMAP
and Other Recent Changes, P. Mendham, UoD
·
SpW Deployment and Handbook (Convenor, B.
Cook, 4Links)
·
Handbook: First survey of needs,
ideas and potential undertakings, B. Cook, 4Links
·
ESA Internal SpaceWire Wiki
- A Conceptual Assessment, H. Helzenius, ESA
·
TopNet pilot demonstrations: First returns
of experience, R. Vitulli, ESA
·
SpaceWire International
Conference 2008 – Osaka/Nara 4-5-6 of November
2008 - (M. Nomachi)
Meeting#10 Wrap-Up, Ph.
Armbruster, ESA
Inter-Agency Meeting, Friday
22nd of February (AM)
Documents:
SpaceFibre Outline
Specification
PID Application:
PID for CCSDS Packet Transfer
Attendance
===================================================
ESA - ESTEC - Electrical Engineering Department - Data Systems Division - Ph. Armbruster – 29/04/2008 (AM)